cristianmart29 cristianmart29
  • 04-04-2018
  • Computers and Technology
contestada

What action is often necessary when installing joists for a cantilever floor?

Respuesta :

idegollacion20
idegollacion20 idegollacion20
  • 14-04-2018
A cantilevered floor is a kind of floor that pops out past the foundation wall below.  Start the joist layout from the longest and strongest run the house or building has. You should also lay floor joists on the stairway's opposing side. Also, remember the 2/3 rule for framing cantilever joists. This means that twice the joist's length should remain inside the structure while the rest sticks out.
Answer Link

Otras preguntas

What is the product of 2 and q
The originators of motivational interviewing (MI) contend that it "honors people’s autonomy, trusting in their own natural wisdom and desire to grow in a positi
Solve for v. -8v+3(v-3) = 16
how does wwater get from the air to the ground
Whats the theme of the most important night of Melanie’s life?
A club has 16 girls and 8 boys as members. The president wants to break the club into groups, with each group containing the same combination of girls and boys.
In goergia the Floridian aquifer is primarily located in the _ region
The products businesses use to produce other goods
¿Qué actividades puedes hacer para fortalecer tu capacidad para regular tus emociones? Elige una de ellas y practica la actividad que más te guste.
When a body part is completely severed its called a(n) ________________