pieman33333 pieman33333
  • 04-04-2018
  • Mathematics
contestada

Three workers can do a job in 28 hours. How many more workers are needed to do this job in 12 hours?

Respuesta :

MrRamon
MrRamon MrRamon
  • 13-04-2018
4 additional workers for 7 total workers.
if it takes 3 workers 28 hours to do work there are 84 total hours of work (3*28=84) to find how many workers it will take to get the work done in 12 hours divide 84 by 12. 84/12= 7 total workers. 7-3= 4 additional workers needed.
Answer Link
pranilraichura
pranilraichura pranilraichura
  • 08-03-2020

Answer:

4 workers

Step-by-step explanation:

Answer Link

Otras preguntas

what was the strongest critisism of the constitutuoon
Which of these choices is NOT a cultural influence on our wellness? A. Attitude B. Behavior C. Hereditary diseases D. Media
The most common units for expressing the density of a substance are the g/cm3. a. True b. False
How to describe an inequality in your own words
2 fractions have the same denominator. Which is the greater fraction: the fraction with the greater numerator or thr lesser numerator
What is urbanization? A. a process in which an increasing number of people move to cities and suburbs B. a process in which the rural population of a region gr
A scientist has discovered the means to block the chemical that directly provides cells with energy for cellular processes. Which cell substance is most likely
how does an electric motor work
3over 25 in one decimal place
Ramona just complete several personal career profiles and is ready to make a career decision. Based on her career profiles, which of the following would be her