henriquefvboas68241 henriquefvboas68241
  • 01-08-2022
  • Business
contestada

In general, the production manager is responsible for the materials price variance. True or false?.

Respuesta :

PallasAthena23
PallasAthena23 PallasAthena23
  • 01-08-2022
False

In general, materials price variance is the responsibility of the purchasing manager, not the production manager.
Answer Link

Otras preguntas

Whats is the definition of Parallel Circuit
The 15th Amendment, which granted African Americans the right to vote, was passed on which date?
IDEAS FOR RECONSTRUCTION, explain why they are good ideas?
If you visit the National Mall, where are you? a. Minneapolis, Minn. b. New York City, N.Y. c. Washington, D.C.
i am having trouble on a math problem for over the summer Use the distributive property to express the sum of 48+84 as a multiple of 2 numbers with no common fa
The acceleration of the gravity Moon is equal to one-sixth of Earth's gravitational acceleration times. if an astronaut has a mass of 60 kg, what is the mass an
How to find the inverse of the function f(x)=2x-3 ? Please
In 1803, the United States bought Louisiana Territory from France. The deal, known as the Louisiana Purchase, doubled the size of the U.S. and opened a new fro
Which two U.S. presidents were impeached?
The song “America” by Neil Diamond conveys a positive message about what often contentious issue?