If 24 electricians can wire some new houses in 15 days, how many electricians would be required to do the job in 12 days?.

Respuesta :

shishirshrestha989
shishirshrestha989 shishirshrestha989
  • 04-01-2022

Answer:

here,

electrician/days

24 - 15

x(let). -12

direct proportion,

then,

exchange X up 24 down

or,24*15=12*X

or,24*15divided by 12=X

X=30

hence,30 electrician required to do complete in 12 days

Answer Link

Otras preguntas

if 100 aluminum cans weigh 4 pounds and recycling center is paying 25 cents a pound how much will robert be payed for his 330 cans
Which expression is equivalent to r^m ÷ r^n?
if the area of triangle ABC= 25 square feet, then the area of the rectangle ABCD is: 25 square feet. 35 square feet. 40 square feet. 50 square feet.
What allowed the United States to develop atomic weapons? (1 point) Research from the Manhattan Project The discovery of plutonium in the American Southwest Sto
NEED URGENT HELP! Match the graph with the correct equation. y – 5= –(x + 3) y – 3 = –(x + 5) y – 3 = (x + 5) y + 3 = –(x + 5)
What expression represents the area of the triangle?
Which lines in this excerpt from Shakespeare's Romeo and Juliet foreshadow the tragic fate of Romeo and Juliet?
Identify at least FIVE characteristics—other than age and sex/gender—by which a nation's population might be measured and categorized
You have prepared a saturated solution of x at 20∘c using 37.0 g of water. how much more solute can be dissolved if the temperature is increased to 30∘c?
How does lifo work compared to fifo?