hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

Gabriela walked to a toy store around noon and , after browsing for 2222 minutes, decided to buy a race car for $9.22. Gabriela handed the salesperson $9.22 for
What important idea about his beloved does the speaker in "When, in disgrace with fortune and men's eyes" convey? A. The love of his beloved makes him envy what
Which of the following best expresses the Conquistador attitude towards Native Americans? Select one: a. An interesting people from whom much could be learned b
What is the energy equivalent of 3 eV? a) 1.6x10-19J b) 3.2x10-19J c) 4.8x10-19J d) 0.53x10-19J
If the flour to sugar ratio is 5 cups flour to 1 cup sugar, then how much sugar is needed if only 2 cups of flour are used? (Give the answer as a fraction)
The unblocking of popular social media websites in Myanmar is an indication that
A lecture was being given to the students A.verb B.noun C.adj
A temperature of –25°C is equivalent to: A. 248 K. B. 25 K. C. –25 K. D. 298 K.
What is the value of m in the equation 1/2m - 3\4n = 16 , when n = 8?
The processes of urbanization, specialization, and trade in medieval Europe led to a decrease in economic opportunities for the lower class the growth of the mi