ekitoiemmah341 ekitoiemmah341
  • 01-11-2021
  • Business
contestada

a budget that is prepared at the beginning of the period for a specific level of activity is called a ______ budget.

Respuesta :

carelesslyandria carelesslyandria
  • 12-11-2021

Answer: planning budget

Explanation:

Answer Link

Otras preguntas

The decision to let someone die, Rachels argues, is a type of action that is subject to moral appraisal. True False
What is the formula for hexaboron tetrabromide
On a coordinate plane, triangle A B C has points (negative 9, 3), (negative 9, 6), (0, 3) and triangle A double-prime B double-prime C double-prime has points (
The Railway Children By Edith Nesbit Chapter I, The Beginning of Things They were not railway children to begin with. I don't suppose they had ever thought ab
Is playing hockey output force or input force?
In your own assessment, does material possessions theory has a great impact in your personality? How? And why did you do it?
13) The condenser pressure is 417.4 psig for r-410A and the condenser outlet temperature is 108f. how much subcooling is there in the condenser
What is the difference between static frication and kinetic friction​
Last month, a truck driver made 5 round-trips to Los Angeles and some round-trips to San Diego. Write an expression that shows how many miles he drove in all. I
On January 2, 2005 Garr Company acquired machinery at a cost of $320,000. This machinery was being depreciated by the double-declining-balance method over an es