razz25
razz25 razz25
  • 03-05-2021
  • Mathematics
contestada

ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

Respuesta :

rylaneckst rylaneckst
  • 05-05-2021

Answer:

100% of the work was done by him

Answer Link

Otras preguntas

How to differentiate between an oxymoron and a paradox
What is the difference between auto fill and fill handle ?​
Metaphors in red kayak
find the x and y intercepts of the graph of the function A. x intercepts (8,0) y intercepts (0,1/2) B. x intercepts none y intercepts (0,1/2) C. x intercepts (1
She orders her about as if she__her daughter. a) would be b) were c) is d) are
PLEASE HELP Will give brainliest and 5.0 rating xx
2sinx / cos3x = tan3x - tanx
What is the horizontal distance between points A(-2.5, -1.5) and B(-0.5, -1.5)
3 and a Half cubes of sand transported at once. How many times do vehicle travel to transport 28 sand cubes. ​
2/3 x 1/7 = Need help not sure if I got it right