Smarie18 Smarie18
  • 04-01-2021
  • Engineering
contestada

What is the preferred approach to risk mitigation?

-Tolerate
-Transfer
-Terminate
-Treat

Respuesta :

oeerivona oeerivona
  • 08-01-2021

Answer:

The correct option is;

Terminate

Explanation:

Termination of the risk is equivalent to elimination of the risk by avoiding the activity that brings about the risk or by using a different process that does not include the risk observed in the previous process option

When the reward far outweigh the risk, it may be decided to terminate or eliminate the risk and miss the reward and also terminate the likelihood of the losses to be incurred.

Answer Link

Otras preguntas

The value of y is directly proportional to the value of x. If y = 60 when x = 240, what is the value of y when x = 100?
What is the importance of kinship (mothers and fathers) and family in the story? According to the Anglo-Saxons, what does your father's linc say about you? Be
[tex]7 + 3 ^{2} \times 2[/tex]elevated the expression ​
In what ways did the Open Door policy save China from European partition?
11. How many circles constitute Dante's Hell? Choose 8 9 10 11
What is the length rounded to the nearest whole number? (length = 25.15 ft) *
What is the what is what and why
20 pts to whoever answers this: At a grocery store, blueberries come packaged in 8-ounce containers for $2.80. At a farmer's market, blueberries cost $4.20 for
A student put some drops of lugols iodine solution into the water in the beaker shown to the right the water turned red after a short time the starch solution i
what does anyone need help with