how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

What is the measure of 1 76 92 118 88
2. A boat in calm seas travels in a straight line and ends the trip 16 km west and 50 km north of its original position. Find the direction of the trip to the n
types of 4 basic tissue and where they belong
Please help need answer
How did the introduction of the stirrup change military warfare during the middle ages​
when did the 2001 September 11th attacks happen
Why does the author of how to jump-start a car include this image
31*20 hey can u help me solve this problem for me.[tex] [/tex]​
How many trophic levels are there typically in a community
the perimeter of a rectangle is 30 in. if its lenth is 3 times the width, find the deminsions​