jaylenlouissaint11 jaylenlouissaint11
  • 03-12-2020
  • Arts
contestada

Which are the planning, design, building,and implementation phases considered to be

Respuesta :

obzooaz
obzooaz obzooaz
  • 03-12-2020

Answer:

Whether you're in charge of developing a website, designing a car, moving a department to a new facility, updating an information system, or just about any other project (large or small), you'll go through the same four phases of project management: planning, build-up, implementation, and closeout.

Explanation:

Answer Link

Otras preguntas

A geothermal plant has been built in a location. Which of these is the most likely impact of the plant on the location? A.) variations in the types of fossils
why do you think spain came to believe that keeping florida was impossible?
This is the name given to the mongol khanate in the western portion of mongol control, in what is now mostly russia and ukraine.
What is the length of BB' ?
The bioavailability of a drug is affected by the A. metabolic rate of the patient. B. gastrointestinal system and absorption rates. C. measureme
How is dna able to store genetic information using sequences?
The graph below shows the number of chairs arranged with different numbers of tables in a room A) there are 4 chairs for every 1 table in the room. B) there are
Oft did the harvest to their sickle yield, Their furrow oft the stubborn glebe has broke; How jocund did they drive their team afield! How bowed the woods be
what is the relationship between the kinetic energy and the gravitational potential energy of the basketball
what is the downfall of the hero in a tragedy