sr9376328
sr9376328 sr9376328
  • 02-12-2020
  • Mathematics
contestada

men can do a work in 32 days in how many days will 24 men complete the same work​

Respuesta :

Аноним Аноним
  • 02-12-2020

Answer:

It will take 32/24, or 1 1/3 days, for 24 men to get the job done.

Step-by-step explanation:

Answer Link

Otras preguntas

You shoot an arrow set a target. The parabolic path of the arrow passes through the points shown in table. X. Y 30. 6 60. 7 100. 4 A. Find a quadratic function
The Habsburg Empire did all of the following EXCEPT A. take control of Hungary, Croatia, and Slovonia. B. lose their Holy Roman Empire in Germany. C. remain a c
let g(x)=x-3 and h(x)=x^2+6 find (h o g) (1)
If 52 x equals 7800 y what does 1 x equal? What is the maths equation?
List all integers between -0.6 and 4.17 THANK U
An object with mass 60 kg moved in outer space. When it was at location < 13, -19, -3 > its speed was 3.5 m/s. A single constant force < 220, 320, -120
f f(x) = 2x2 and g(x) = 3x, what is (g o f)(x) a. 6x2 b. 9x2 c. 18x2 d. 8x4
which foods earthworms can digest?
Write a complete reaction of succinic acid and acetic anhydride
You would expect a phosphorous-chlorine bond to be 1. nonpolar, with the neither end having a partial charge. 2. polar, with neither end having a partial charge