katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

162x + 731 = −y − 9x-2 vertex form
Over 11.2 hours, the temperature changed −2.9 degrees each hour. What was the total temperature change? Enter your answer in the box
2bx-be=-8 what is the answer for this question
A 1000 kg weather rocket is launched straight up.The rocket motor provides a constant acceleration for 16 s, then the motor stops. The rocket altitude 20 s afte
which has prokaryotic cells
Which word best describes Beowulf’s attitude toward his impending battle with the dragon
If an amino acid has a side chain (r group) that is charged (i.e. bears a full + or – charge), which amino acid group would it belong in?
Alcohol affects the brain, reducing a person's ability to think clearly. The driver may not _________________ and actually feel he / she is performing better th
Describe how the English-speaking population first came to Australia. How did forced migration play a role in the colonization and settlement of Australia?
history question down below