Mixedemotions1150 Mixedemotions1150
  • 04-03-2020
  • Computers and Technology
contestada

A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

if i get paid 7.25 and i get 30 hours how much is my check
Adolf Hitler flattered the German people by calling them the _______
What did the Puritans of Massachusetts hope to create?
what fraction of a pound is 25 pence
Which statement describes both the First and Second Industrial Revolutions? Both revolutions resulted in migration from urban to rural areas. Both revolutions l
Which of the following was a goal of the North Africa Offensive? to prevent the Axis powers from establishing full control of the Mediterranean region to draw H
facts on Jason Scarpace
Civil society refers to
Which social reformer would support this cause above all others? Mother Jones Washington Gladden Samuel Gompers Emma Lazarus
QUICK QUESTION! The human body’s main source of energy comes from: carbohydrates proteins fats vitamins/minerals